Malaysian Government Document Archives
Advanced Search…
  • Log in
  • Home
  • Documents
  • About
  • New Unsorted
You are here:
  1. Home
  2. Documents
  3. Ministry of Natural Resources and Environment
  4. EIA Reports
  5. ENVIRONMENTAL IMPACT ASSESSMENT (S2EIA) FOR THE PROPOSED OIL PALM AND COCONUT PALM PLANTATION AT MUKIM PADANG ENDAU
  6. Appendices
Appendices https://govdocs.sinarproject.org/documents/ministry-of-natural-resources-and-environment/eia-reports/environmental-impact-assessment-s2eia-for-the-proposed-oil-palm-and-coconut-palm-plantation-at-mukim-padang-endau/appendices https://govdocs.sinarproject.org/@@site-logo/logo.png

Appendices

Appendix 1-1 Rancangan Tempatan Majlis Daerah Mersing 2030 (Penggantian).pdf
Appendix 2-1 Term of References Report and Approval Letter from DOE Putrajaya.pdf
Appendix 2-2 Letter Extension TOR.pdf
Appendix 2-3 Engagement with Agencies.pdf
Appendix 5-1 Land title.pdf
Appendix 5-2 Logging Licences issued by Forestry Department Negeri Johor (PTD 4118 and PTD 4084).pdf
Appendix 6-1 Letter and Soil Suitability Report from Department of Agriculture.pdf
Appendix 6-2 Letter from DID (Flood Prone).pdf
Appendix 6-3 Certificate of Analysis for Ambient Air Quality.pdf
Appendix 6-4 Certificate of Analysis for Noise Level.pdf
Appendix 6-5 Certificate of Analysis for Surface Water Quality (High Tide).pdf
Appendix 6-5 Certificate of Analysis for Surface Water Quality (Low Tide).pdf
Appendix 6-6 Installation Monitoring Well Report by Geoscience Solutions Sdn. Bhd.pdf
Appendix 6-7 Certificate of Analysis for Groundwater Quality.pdf
Appendix 6-8 Socio Economy Study Report.pdf
Appendix 6-9 Letter from Department of Fisheries (No Fisheries Information).pdf
Appendix 6-10 Letter from Department of Fisheries (No Aquaculture Activity).pdf
Appendix 8-1 Sediment Basin Design.pdf
© 2017-2025 Sinar Project.
Government documents are public domain or copyright Government of Malaysia.
  • Site Map
  • Accessibility
  • Contact
Powered by Plone & Python